Calendar Navigation

Author Message

Jörg Wurzer

Monday 03 October 2005 7:13:00 am

Does someone know a solution for a calendar based navigation for artikles. I have to develop a navigation for an event calendar (tv programe).

Powered by eZ Publish™ CMS Open Source Web Content Management. Copyright © 1999-2014 eZ Systems AS (except where otherwise noted). All rights reserved.

eZ debug

Timing: Jan 18 2025 18:15:19
Script start
Timing: Jan 18 2025 18:15:19
Module start 'layout'
Timing: Jan 18 2025 18:15:19
Module start 'content'
Timing: Jan 18 2025 18:15:19
Module end 'content'
Timing: Jan 18 2025 18:15:19
Script end

Main resources:

Total runtime0.0205 sec
Peak memory usage2,048.0000 KB
Database Queries3

Timing points:

CheckpointStart (sec)Duration (sec)Memory at start (KB)Memory used (KB)
Script start 0.00000.0076 589.0391152.6250
Module start 'layout' 0.00760.0030 741.664139.4297
Module start 'content' 0.01060.0073 781.093884.0859
Module end 'content' 0.01790.0025 865.179730.3047
Script end 0.0204  895.4844 

Time accumulators:

 Accumulator Duration (sec) Duration (%) Count Average (sec)
Ini load
Load cache0.002914.2917140.0002
Check MTime0.00125.6584140.0001
Mysql Total
Database connection0.00178.280310.0017
Mysqli_queries0.003014.442030.0010
Looping result0.00000.053610.0000
Template Total0.00188.910.0018
Template load0.00104.666110.0010
Template processing0.00094.162910.0009
Override
Cache load0.00073.312610.0007
General
dbfile0.002813.743180.0004
String conversion0.00000.048940.0000
Note: percentages do not add up to 100% because some accumulators overlap

Templates used to render the page:

UsageRequested templateTemplateTemplate loadedEditOverride
1print_pagelayout.tpl<No override>extension/community/design/community/templates/print_pagelayout.tplEdit templateOverride template
 Number of times templates used: 1
 Number of unique templates used: 1

Time used to render debug report: 0.0001 secs